Painting your Home

  • Pick out your paint colors.
  • Sample paint the body, trim, and fascia colors onto an area of your house. 
  • Download and complete the Paint Application (even if you are just re-painting the same color). 
  • Turn the completed form into the PHCA office - in person or by email to cdc@princevillecommunity.com.
  • The sample paint will be viewed by the Design Committee.
  • When approved, you will be notified in writing in which case you can proceed to paint the entire house. 
  • Once complete, call (808) 977-8715 for a Final Inspection. 

The entire process can take as little as a few days! 


Roofing Your Home

  • Pick out your roofing material with the following guidelines in mind: 
    • All asphalt and composite roofing materials are to be a minimum of two-piece laminated construction
    • For purposes of architectural consistency the following materials have been prohibited
      • Low profile asphalt or fiberglass shingles.            
      • Mineral roll roofing
      • Corrugated metal roofing.
      • Painted galvanized roofs.
      • High gloss tile roofs.
    • All composite roofing materials are to have a minimum 10-year algae resistance warranty, a copy of which is to be provided to the CDC. Historically, any roofing material without this treatment has proven to quickly mildew and blacken creating a major expense and maintenance problem for the homeowner. 
  • Fill out the Roof Application (even if re-roofing with same material) and submit it to the PHCA office. 
  • The Design Committee will review your request.
  • When approved, you will be notified in writing.
  • Once completed, call (808) 977-8715 to schedule a Final Inspection.