Princeville Infrastructure Projects

Updated 10/8/2021.

Please note, the schedule below is subject to change and weather permitting. Bookmark this webpage and visit often for updates.


ROAD REPAVING

During the road repairs, traffic may be limited to 1 lane for both directions
(traffic control will be in place). Please give yourself extra time to get where you need to be, drive safely, and follow traffic control instructions.

** Please drive with caution. The removal of the existing asphalt will result in a 2” drop until the new asphalt has been placed.
** Driveways will not be accessible while new asphalt is placed and cures.


ROAD REPAVING SCHEDULE


MONDAY 10/11:
Kekaulike Lane between Nalani Lane and Ka Haku Road will be closed from 8am - 5pm for repaving. Please use Emmalani Drive near Prince Albert Park to enter / exit the neighborhood.

TUESDAY 10/12:
Removal of asphalt on Kamehameha Road.
Removal of asphalt results in a 2" drop - please drive with caution.

WEDNESDAY 10/13:
Repave Kamehameha RoadDriveways will not be accessible for a period of time while new asphalt is placed and cures.

TUESDAY 10/19:
Rebuild speed humps on Liholiho Road and Pepelani Loop.

WEDNESDAY 10/20:
Build new speed humps on Kamehameha Road.